Tuesday, June 25, 2024

Sewer line update. pipe work is a work of art

Started hooking existing sewer lines to the new 6 inch pipe today.

The cone is the shut off valve for the water line we found yesterday.  The 2 white pipes are 4 inch existing lines from the park on the north side of the new 6 inch line.

In the pic below you can see the 4 inch lines on the north side of our new line.  They are the same as above, and if you look you can barely see a 6 inch line on the south side of the 6 inch line we are putting in.

I think the 6 inch line we came across is for sites 1-6 and the dump station.


No comments: