Beautiful day today, fun to watch the moon set during another great sunset tonight.
Friday, September 06, 2024
Wednesday, August 28, 2024
the fly
Monday, August 26, 2024
Phase 1 begins - putting in the new sewer hookups
The digging should go a lot better now. The only utilities we will be coming across should be broken and unused.
This area will be a straight line up the hill. There will be 9 spaces here.
Saturday, August 24, 2024
Fawns at Choteau Mountain View RV Campground
These fawns were wandering around the park this morning before tunning up the hill to make their exit.
Friday, August 23, 2024
Sewer update: tweaking the manhole
They decided to move the uphill side of the pipe a little higher on the manhole entrance, so they had to grind the concrete away from the pipe and raise it a couple of inches. They also added concrete to the bottom of the floor to make a deeper groove tor the 'stuff' to flow, and just in case there is a back flow and the manhole starts to fill up, they will slope the part where the ladder is so all the 'stuff' will slip back into the channel, keeping the spot where one might need to stand to stay relatively clean.
The city came out and ran some water down it and the guys said it made a great whirl pool action.
Wednesday, August 21, 2024
sewer update: making the manhole work
Now that the manhole is in place, and the pipes holes drilled out, they will concrete in the pipes, and put concrete in the bottom of the manhole with a grove in the concrete for the 'stuff' to flow around the corner.
Tuesday, August 20, 2024
sewer line update: the new sewer manhole arrival
It was exciting to see the big flatbed truck pull into the property with the new manhole on the bed.
Sunday, August 18, 2024
sewer line update: past the 3 tent spaces, road and into the field
When the guys were witching the area for power and water they could not figure out what was what, it was like there were lines all over, but when they actually dug they did not find anything, probably because the sewer pipe is so shallow.
As soon as they got into the field they found water and unused electrical lines. I saw it, but failed to get a pic.
They dug out 35-40 feet from the road and are ready to place the manhole in the ground. the Y at the end of the pipe in the pic will be for site number 38.
The pipe is over 800 feet long from manhole to manhole.
below is a shot of the field where we are resurrecting the old broken sites. Seems like a bare field until you start walking thru and seeing hoses poking up from old water hose bibs.
In the distance, the Swing set and rocks behind the swing set will be removed. The rocks will be reused for landscaping, and the swing set is super old and not in good shape, so we will scrap it.
Monday, August 12, 2024
Bald Faced Hornets
Ronnie was trimming the dead limbs off of one of the trees and found what looked to me like a paper wasps nest, but when we looked closer they were black.
Thursday, August 08, 2024
dog day afternoon
Tuesday, August 06, 2024
sewer project update thinking of the future
We are passing some water electric only spaces, no sewer hookups. We decided to put 2, 4 in Y's along here.
The one is between spaces 22 and 23, and the other is between spaces 21 and 22.
The vertical pipe is just a marker, and has metal tape on it to help find it, and is shallow so whoever is looking for it will know they are in the right spot.
Monday, August 05, 2024
Sunset - Choteau Mountain View RV Campground
It was a beautiful day at the park today, rained last night and you could smell the fresh rain in the air.
The day got topped off by a beautiful sunset!
Suzi got this great shot (below) while Boomer dog was walking her and Carol on the Soroptimist Trail between the Choteau Country Club Golf Course and Choteau Mountain View RV Campground.
sewer update passing cabin 2 and cabin 3
Had better luck with not hurting the power lines this week.
It was interesting Cabin 2's electric line is super shallow and inside of a piece of PVC pipe.
Friday, August 02, 2024
sewer update cabin 1 to cabin 2
The electrician was here first thing in the morning to splice the electric line to Cabin 1.
Since it is Friday, they only dug up to where they need to start hand digging for the wire across to Cabin 2. They also worked on making spaces 7 and 8 rentable.